Process control system for an aluminum extrusion billet plant

Modernized the plant's automation system, replacing local Siemens S7-200 controllers with a centralized control system based on Schneider Electric TM262. Implemented a unified process control architecture, improving reliability, response time and system scalability. Carried out a full commissioning cycle, bringing all plant equipment into operation.

Process control system for an aluminum extrusion billet plant 1
Open
Process control system for an aluminum extrusion billet plant 2
Open
Process control system for an aluminum extrusion billet plant 3
Open
Process control system for an aluminum extrusion billet plant 4
Open
Process control system for an aluminum extrusion billet plant 5
Open
Process control system for an aluminum extrusion billet plant 6
Open

Installation of a high-temperature burner and its automation system

Design, assembly and installation of a copper melting furnace heating system. Equipment from Eclipse, a leading global manufacturer, was used. Delivered the full scope of work — from design to installation, control system integration and automation setup. Carried out commissioning with combustion parameter optimization and safety system testing.

Installation of a high-temperature burner and its automation system 1
Open
Installation of a high-temperature burner and its automation system 2
Open
Installation of a high-temperature burner and its automation system 3
Open

Installation of a solid-fuel steam boiler plant

Delivered a complete cycle of work — from technical documentation development to installation of a 4 t/h steam boiler, flues, chimney, fuel supply systems and auxiliary equipment. Commissioning was carried out with testing of all process modes.

Installation of a solid-fuel steam boiler plant 1
Open
Installation of a solid-fuel steam boiler plant 2
Open
Installation of a solid-fuel steam boiler plant 3
Open

Maintenance of a 30 t/h steam boiler plant

Performed maintenance of steam boiler plant equipment, checked heat-engineering parameters, measured combustion tuning quality, and verified the operation of the boiler safety systems.

Maintenance of a 30 t/h steam boiler plant 1
Open
Maintenance of a 30 t/h steam boiler plant 2
Open
Maintenance of a 30 t/h steam boiler plant 3
Open
Maintenance of a 30 t/h steam boiler plant 4
Open

Repair of the boiler front-plate thermal insulation

Carried out a full repair to restore the thermal insulation of the boiler front plate. Removed worn refractory fireclay and installed high-quality fire-resistant insulation wool. The new materials increased boiler efficiency and eliminated cracking issues.

Repair of the boiler front-plate thermal insulation 1
Open
Repair of the boiler front-plate thermal insulation 2
Open
Repair of the boiler front-plate thermal insulation 3
Open

Installation of automation and power supply systems for a steam boiler plant

Carried out a full scope of installation work on boiler-plant automation and power supply. Designed and built the boiler control cabinet. Performed heat-engineering commissioning: optimized operating modes, improved energy efficiency, and reduced fuel consumption.

Installation of automation and power supply systems for a steam boiler plant 1
Open
Installation of automation and power supply systems for a steam boiler plant 2
Open
Installation of automation and power supply systems for a steam boiler plant 3
Open

Installation of automation and gas supply systems for a Nagema G30 wafer oven

Carried out a full scope of installation and commissioning work. Implemented monitoring and control systems with precise temperature control and real-time monitoring. The upgrade improved equipment safety and energy efficiency.

Installation of automation and gas supply systems for a Nagema G30 wafer oven 1
Open
Installation of automation and gas supply systems for a Nagema G30 wafer oven 2
Open
Installation of automation and gas supply systems for a Nagema G30 wafer oven 3
Open
Installation of automation and gas supply systems for a Nagema G30 wafer oven 4
Open

Installation of a burner and control system for a copper melting furnace

Installed a Kromschröder BIC burner and designed a PLC-based automation cabinet. LPG is used as fuel. The upgrade improved safety through automatic monitoring and an emergency shutdown system.

Installation of a burner and control system for a copper melting furnace 1
Open
Installation of a burner and control system for a copper melting furnace 2
Open
Installation of a burner and control system for a copper melting furnace 3
Open
Installation of a burner and control system for a copper melting furnace 4
Open

Commissioning of the Laser confectionery line with ESA burners

Carried out commissioning of the Laser confectionery production line, checked heat-engineering parameters, measured combustion tuning quality, and verified the operation of components and mechanisms.

Commissioning of the Laser confectionery line with ESA burners 1
Open
Commissioning of the Laser confectionery line with ESA burners 2
Open
Commissioning of the Laser confectionery line with ESA burners 3
Open
Commissioning of the Laser confectionery line with ESA burners 4
Open

Automation of a DA-5/4 deaerator

Designed an automation system for an atmospheric DA deaerator, installed the control cabinet, and carried out commissioning work.

Automation of a DA-5/4 deaerator 1
Open
Automation of a DA-5/4 deaerator 2
Open
Automation of a DA-5/4 deaerator 3